Home Remodel Nov. 1-9
The next step is putting in the rebar.  This they do in a grid pattern with little blocks under each joint to hold it above ground.
The workers are usually here about 7 or 7:30 am.  That is fine, but a delivery truck showed up at 6:45 this morning. Too early for me and my neighbors!  The joys of home remodel. At this point we had to have two inspection.  One to make sure the connection to the old foundation was going to be good and a second by a city inspector to check the rebar etc.
Thursday Nov. 9 they brought in the Cement truck. Then the pumper equipment so they could pump the concrete from the street to the back yard.
They start putting the concrete in the footing frames. More to follow.